Since 1987

logo

peologo2

 

 

HVAC

MARYMOUNT ACADEMY HEATING BOILER REPLACEMENT
Client: Sudbury Catholic District School Board
Project: Exhaustive investigation study and report looking at various manufacturers of hot water boilers followed by detailed engineering and contract administration to replace hot water gas fired heating boiler with 3 750,000 btuh, mid-efficiency, atmospheric water tube boilers, updated controls with existing boiler tied in for emergency backup.

ST. CHARLES SCHOOL HEATING BOILER REPLACEMENT
Client: Sudbury Catholic District School Board
Project: Investigative study followed by detailed engineering and contract administration to replace hot water gas fired heating boiler with three mid-efficiency, atmospheric water tube boilers with updated controls.

WARREN ARENA COMMUNITY CENTRE
Client: Municipality of Markstay and Warren
Project: Replace single water tube boiler with a 4 module low NOX high efficiency cast iron boiler with indirect domestic water heaters and microprocessor based outdoor rest controller.

SERPENT RIVER HEALTH CENTRE
Client: ANO Architects
Project: Hot water gas fired heating boiler, radiant floor heating, DDC controls.

LITTLE CURRENT FIRE HALL
Client: Town of Little Current
Project: New oil fired boiler and radiation to replace outdated oil forced air system.

LITTLE CURRENT VISITOR INFORMATION CENTRE
Client: Town of Little Current
Project: New oil fired boiler and combination air/fin tube radiation to replace an electric forced air system.

J. N. DESMARAIS LIBRARY
Client: Laurentian University
Project: Investigation into various office areas experiencing temperature control problems and lack of fresh air followed by engineering design and drawings to correct shortcomings.

SUDBURY ALGOMA HOSPITAL INDOOR AIR QUALITY STUDY
Client: Network North
Project: Investigation into complaints about indoor air quality including odours, stagnant air, fresh air and air balancing.

CLARABELLE MILL OFFICE AREA HEATING AND VENTILATION SYSTEM IMPROVEMENTS
Client: Inco Limited
Project: Investigation, analysis and recommendations for improving indoor air quality.

INCO HEAVY REPAIR SHOP LADLE VENTILATION, LIVELY
Client: Inco Limited
Project: Industrial ventilation for the extraction of welding fumes for a new ladle repair area.

INCO CREAN HILL No. 2 SHAFT CONTROL ROOM
Client: Wright Air Systems Ltd./Inco Limited
Project: Preparation of heating, ventilation and air conditioning drawings for new central control room.

INDOOR AIR QUALITY - ESPANOLA BOARD OF EDUCATION
Client: The Espanola Board of Education
Project: Investigation into indoor air quality at Board's Administration Office and A.B. Ellis Public School. Preparation of engineering design and drawings to install heat recovery ventilation system at two noted buildings.

TIMMINS BINGO HALL
Client: Cotnam Belair Associates Architects Inc.
Project: Energy recovery ventilation system to remove cigarette smoke for an occupant level of 300 people.

MOOSE FACTORY HOSPITAL COMPLEX, MOOSE FACTORY
Client: Cotnam Belair Associate Architects Inc., Timmins
Project: Conduct a facility audit of the mechanical/electrical equipment and systems identifying shortcomings and recommendations for improvements. A major component of the audit was to identify areas where energy efficiency could be improved.

NORTHERN COLLEGE OF APPLIED ARTS AND TECHNOLOGY - SOUTH PORCUPINE, KIRKLAND
LAKE AND HAILEYBURY CAMPUSES

Client: Cotnam Belair Associate Architects Inc., Timmins
Project: Conduct a facility audit for three campuses and develop a life cycle program to replace mechanical/electrical equipment and systems with a particular emphasis on energy efficiency.

ENERGY MANAGEMENT SYSTEM FOR CIVIC SQUARE COMPLEX
Client: Regional Municipality of Sudbury
Project: Mechanical/electrical design, drawings and specifications for the installation and commissioning of direct digital control system (DDC) to manage the HVAC Systems for a 300,000 ft2 municipal building.

HEATING BOILER REPLACEMENT, ECOLE SECONDAIRE THERIAULT, TIMMINS
Client: Cotnam Belair Associates Architects Inc.
Project: Preparation of mechanical/electrical design, drawings and specifications and tender documents for a gas fired multiple boiler system with a total BTU input of 11 million.

ADVANCED ABSORPTION GAS-COOLING EQUIPMENT FIELD EVALUATION
Client: Laurentian University
Project: A study to compare gas absorption cooling technology versus electric reciprocating compressor technology at the newly constructed health sciences building.

MEDICAL BUILDING HEATING CONVERSION
Client: The Corporation of the Town of Espanola
Project: Replacement of electric resistance based heating system with a natural gas bas system with an emphasis on improving indoor air quality and reducing fuel costs.

SAULT STE. MARIE ARMOURY BOILER REPLACEMENT
Client: Department of National Defense
Project: Replace two 300 H.P. steam boilers with two 120 HP steam boilers and conduct asbestos investigation.

UPGRADE VENTILATION SYSTEM AT FIRE RECYCLE BUILDING, SUDBURY
Client: Ministry of Natural Resources
Project: Upgrade existing ventilation system for workshop used to repair and test internal combustion engines to comply with current government regulations.

VENTILATION AND AIR CONDITIONING UPGRADING VARIOUS SCHOOLS
Client: The Sudbury Board of Education
Project: Preparation of mechanical engineering design and drawings to upgrade the ventilation and air conditioning systems in various schools.

DUST CONTROL SYSTEM FOR LONGYEAR CANADA, NORTH BAY
Client: Longyear Canada
Project: Preparation of mechanical design and drawings for an industrial ventilation system for carbon drill dust.

INCO COPPER REFINERY AIR CONDITIONING, SUDBURY
Client: Metal-Air Mechanical Systems
Project: Preparation of mechanical and electrical design and drawings for a split system air conditioning system at the Copper Refinery Administration Building.

IMPROVEMENT TO AIR HANDLING SYSTEM AT MGS DISTRICT OFFICE, SUDBURY
Client: Ministry of Government Services
Project: Analysis of present air handling systems, preparation of report with improvement recommendations, mechanical engineering designs, preparation of drawings and specifications.

CHAPLEAU PUBLIC SCHOOL BOILER MODIFICATIONS
Client: Chapleau Board of Education
Project: Preparation of mechanical engineering design and drawings for a new flame retention oil burner and piping to connect two existing boilers in parallel.

INCO CREAN HILL NO. 2 SHAFT CONTROL ROOM
Client: Wright Air Systems Ltd./INCO Ltd.
Project: Preparation of heating, ventilation and air conditioning drawing and mechanical design for a new central control room.

NORTHERN COLLEGE OF APPLIED ARTS AND TECHNOLOGY - PORCUPINE CAMPUS- VARIOUS HVAC PROJECTS
Client: Cotnam Belair Associates Architects
Project: Investigation into various areas within the college experiencing air balancing and HVAC problems. Prepare engineering, design, drawings and specifications to correct deficiencies.

 